Figure 2-7. Sample Condensate Trap Installation

2.10 GAS SUPPLY PIPING

The AERCO Innovation Gas Components and Supply Design Guide, GF-5030 (see Appendix J) must be
consulted prior to designing or installing any gas supply piping.

WARNING

NEVER USE MATCHES, CANDLES, FLAMES OR OTHER SOURCES OF
IGNITION TO CHECK FOR GAS LEAKS

.

CAUTION

Many soaps used for gas pipe leak testing are corrosive to metals. Therefore,
piping must be rinsed thoroughly with clean water after leak checks have been
completed.

NOTE

All gas piping must be arranged so that it does not interfere with removal of any
covers, inhibit service/maintenance, or restrict access between the unit and
walls, or another unit.

Innovation units contain a 1

inch NPT gas inlet connection on the rear of the unit as shown in Figure 2-3.

Prior to installation, all pipes should be de-burred and internally cleared of any scale, metal chips or other
foreign particles. Do Not install any flexible connectors or unapproved gas fittings. Piping must be
supported from the floor, ceiling or walls only and must not be supported by the unit.

A suitable piping compound, approved for use with natural gas, should be used. Any excess must be
wiped off to prevent clogging of components.

To avoid unit damage when pressure testing gas piping, isolate the unit from the gas supply piping. At no
time should the gas pressure applied to the unit exceed 14” W.C.. Leak test all external piping thoroughly
using a soap and water solution or suitable equivalent. The gas piping used must meet all applicable