Innovation series water heaters gf-128 – AERCO Innovation (G-10-1350 to G-11-0563) User Manual

Page 37

Advertising
background image

Chapter 3

Innovation Series Water Heaters

GF-128

Operation

USER MANUAL

OMM-0079_0B

07/21/11 AERCO International, Inc.

· 100 Oritani Dr. · Blauvelt, NY 10913 · Ph: 800-526-0288

Page 37 of 200

Figure 3-4.

Air/Fuel Valve In Purge Position

4. Next, the blower proof switch on the Air/Fuel Valve (Figure 3-5) closes. The display will show Purging

and indicate the elapsed time of the purge cycle in seconds.

Figure 3-5. Blower Proof Switch

5. Upon completion of the purge cycle, the Control Box initiates an ignition cycle and the following

events occur:

(a)

The Air/Fuel Valve rotates to the low-fire ignition position and closes the ignition switch. The dial
on the Air/Fuel Valve (Figure 3-6) will read between 25 and 35 to indicate that the valve is in the
low-fire position.

(b)

The igniter relay is activated and provides ignition spark.

(c)

The gas Safety Shut-Off Valve (SSOV) is energized (opened) allowing gas to flow into the
Air/Fuel Valve.

Advertising