C&D Technologies RS-1476 Standby Battery Vented Cell User Manual

Page 25

Advertising
background image

1.4 Battery Performance Tests

Batteries are rated on their ability to deliver a certain number of amperes or watts to the load for a specified amount

of time before the battery voltage drops to a final cut off voltage. It is important to recognize that the performance of a

cell or battery depends on several factors:
1. the discharge rate
2. electrolyte temperature at the start of the discharge
3. state of charge
4. integrity of the connections
5. operating history and age of battery

Consult your C&D specification sheets for ratings of various cell types.
To be valid, a performance test requires that the following conditions exist:
• A fully charged battery, balanced cell potentials, and specific gravity. In some cases, this may require an equalize

charge or, in cases of sulfation, other action. Consult with the C&D Technical Services Department.

• Battery must remain at float voltage for at least 72 hours prior to test. This is especially important following an

equalize charge to clear the gases developed at the surface of the plates.

• All connections; inter-cell, inter-row and inter-aisle must be optimized to their minimum resistance and all

connections securely tightened. Refer to Part 1, Sections 4.7 and 4.8.

The discharge rate depends upon the type of test. For an acceptance or performance test, the discharge rate should be

a constant current or constant power load equal to the rating of the battery for a selected test duration and to a final

predetermined voltage. In order to facilitate meaningful analysis, any test data submitted to C&D for review must be

collected in accordance with IEEE-450 (latest revision) procedures. If the test is run to determine battery capacity, the

documentation must demonstrate that the battery was fully charged prior to test. Initial readings as well as discharge

readings must be included in the data submitted. All voltage and current measurements must be taken at the battery/cell

terminals.

REFERENCE INFORMATION

A complete description of testing vented lead acid batteries is beyond the scope of this manual but is discussed in

detail in

IEEE STD-450 or supplements and other professional standards.

It is important to recognize that standby batteries are designed for a finite number of discharges. Excessive

testing or cycling of the battery can materially shorten battery life. For more information, refer to Part 2,

Section 4, Battery Operation, Float Service.

CAUTION

A battery string must be disconnected from the charging bus before working on individual cells or batteries. In

multi-cell units disconnecting an inter-cell (same container) connector does not guarantee the absence of voltage

or current at the end terminals. A potential shock hazard may therefore exist. This is very important since there is

always the possibility of a small current leak path across an inter-cell partition.

1.5 Connection integrity

Connection integrity is critical to the safe and efficient operation of any battery. This is the sole responsibility of the

installer/end user. Connections must be inspected at least once a year for the following:
• CLEANLINESS: Remove all corrosion by-products and restore as described in PART 1, Section 4.6.
• TIGHTNESS: Re-torque all connections at least once a year to the re-torque values given in Table 3.

Refer to Part 1, Sections 4.7 and 4.8.

• HARDWARE: Replace worn or damaged hardware.
The importance of connection integrity cannot be overemphasized. Take time to check all connections periodically.

Batteries with voltages of 250 volts or greater and/or batteries used in high rate applications should have their

connections inspected at least twice each year.

CAUTION

An improper or loose connection can cause arcing and possible a fire.

PART 4

REFERENCE INFORMATION, TROUBLE SHOOTING & EXTENDED MAINTENANCE (CONTINUED)

RS1476/0215/CD

23

www.cdtechno.com

Advertising