Cabinetry, Cutoutfor frameless cabinets, Frameless cabinets – GE ZET1SMSS User Manual

Page 7

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Cabinetry

A4

Single Oven Cutout
for Installation Over
a Monogram Warming

Drawer

A5

Double Oven Cutout

for Installation Over

a Monogram Warming

Drawer

Per Warm­
ing Drawer

Requirement

Anti-Tip Block Against

RearWall PerWarming
Drawer Requirement

2" (5.1 cm) Min.

NOTE:

Install the

oven only with spe­
cific models listed on
the label located on
top ofthe oven

1" (2.5 cm) Min. Above Toekick or

Adjustto Oven Installation Height

NOTE: Additional clearances between cutouts may
be required. Check to be sure the oven supports

above the Worming Drawer location do not ob­
struct the required interior depth and height.

Anti-Tip Block
Against Rear
Wall Per Worm­

ing Drawer
Requirement

Per Worm­
ing Drawer

Requirement

1" (2.5 cm) Min. Above Toekick

When installing a Monogram Worming Drawer

below a single or double oven, a separate 120V,
60 Hz, properly grounded receptacle must be
installed. Refer to
installation instructions pocked with the

Worming Drowerforspecific installation

requirements.

A6

Cutoutfor Frameless Cabinets

Frameless Cabinets

Whenever possible, order 30" (76.2 cm) frameless
cabinet with the cutout sided to fit
the oven. If using stock cabinets, additional fin­

ished filler pieces may be required to

cover the opening.

• A stock frameless cabinet cutout width

may be up to 28 3/4" (73 cm). If necessary, odd

1/2" (1.3 cm) cleats to the sides, fiush with the

front edge ofthe side panels to accept mount­

ing screws.

Cabinet Depth
23 1/2" (59.7 cm)
Min. From Inside
Bock to Front of
Cabinet Frame
or Side Panel

3/4" (1.9 cm) Min.
Thick Bottom Shelf
Cut Back Flush with
Front of
Side Panel

Advertising
This manual is related to the following products: