APPENDIX 1

DOWNFLOW/HAND INTAKE SETTINGS

BIOHAZARD CABINETS-Class II

INFLOW MEASUREMENT USING THE THERMOANEMOMETER METHOD

MODEL

CABINET

TYPE

CALCULATED

HAND INTAKE

VELOCITY

DOWNFLOW

HIGHEST READING

AND LOWEST

READING

11228 BBC 86

A2

0.505

-0.555m/s

0.305 - 0.355m/s

±20

% OF AVERAGE

To set the air velocity of the opening work area correctly, we emphasize again that only

qualified persons using calibrated equipment may carry out the adjustments. If you have

difficulties, please contact the manufacturer.

NOTE: Adjustments must be made in conjunction with the down flow air velocity

profiling section and it is necessary to have a balance test between them.

3.2.3 Downflow air velocity

The equipment’s airflow should be balanced and generally the only requirementis outlined in

Section 3.2. However, as the HEPA filter becomes loaded, the readings on the static pressure

monitor will increase (located on the control panel). The fan speed needs to adjust so it can

build up to the correct air velocity within the working chamber. The equipment is designed with

an air damper. We can control the exhaust and inflow air ratio by adjusting the positions of the

damper. The setting is done in the factory and generally needs no adjustment. The

equipment’s correct settings and the testing data are in feet per Minute (FPM)

NOTE: Adjustments to the balance of the air velocity should be made by a certified

Technician.

3.2.4 Pressure test:

When testing pressure, the PAO test port can be used to introduce the pressurizing gas

(generally air).

3.3 Sterilization:

Before sterilizing the equipment, do not remove the front grids or the drainage valve.

You must sterilize the equipment per the following:

-------Before operation

-------Before replacement of the filter

-------Before performance testing (unless the equipment is new and has never been used)

-------Before moving the equipment