5 unpacking, setup and commissioning, 1 assembly of the pallet truck scale, 1 drawbar – KERN & SOHN VFS 2T1 User Manual

Page 8: Unpacking, setup and commissioning, Assembly of the pallet truck scale, Drawbar

Advertising
background image

VFS-BA-e-1111

8

5 Unpacking, Setup and Commissioning

5.1 Assembly of the pallet truck scale

5.1.1 Drawbar

The drawbar is delivered separated from the hydraulic lifting device. Prior to
commissioning the two components must be connected to each other. Details see
below.

Ö Turn out screw for hydraulic

adjustment

Ö Pass the draw chain of the drawbar through the opening and after that through

the bolt in the pallet truck scale

Advertising