5 unpacking, setup and commissioning, 1 assembly of the pallet truck scale, 1 drawbar – KERN & SOHN VFS 2T1 User Manual
Page 8: Unpacking, setup and commissioning, Assembly of the pallet truck scale, Drawbar
Advertising
VFS-BA-e-1111
8
5 Unpacking, Setup and Commissioning
5.1 Assembly of the pallet truck scale
5.1.1 Drawbar
The drawbar is delivered separated from the hydraulic lifting device. Prior to
commissioning the two components must be connected to each other. Details see
below.
Ö Turn out screw for hydraulic
adjustment
Ö Pass the draw chain of the drawbar through the opening and after that through
the bolt in the pallet truck scale
Advertising