Fieldpilot, Installation, Fieldpilot valve existing run t steering orbital – TeeJet FieldPilot Install Miller 22xx T T-SS T-ET HT User Manual

Page 10

Advertising
background image

8

www.teejet.com

FieldPilot

®

installation

If there are questions concerning the installation of the FieldPilot system on this vehicle, or due to the

changes in component specifications the parts supplied in the kit are not exactly as presented in this

document, please contact your dealer or TeeJet Customer service representative for clarification

before installation. TeeJet Technologies is not responsible for misuse or incorrect installation of the system.
NOTE: BE VERY CAREFUL TO ABSOLUTELY SECURE ALL CABLES AND HOSES SO THAT THEY DON’T

INTERFERE WITH THE MANY MOVING PARTS OF THE MACHINE!

overview of the Machine

• The FieldPilot valve will mount on the left had side of machine above the cat walk between cab and tank

using the main cross over beam.

• The pressure will come from an existing Run T off the pressure port of the priority valve-located between cab

and tank.

• The Left & Right and tank connections will be at the steering orbital, front of machine

NOTE: All references to left and right are stated as if the user is seated in the driver’s seat.
Figure 1-3: Overview of the Machine

Fieldpilot

Valve

existing

Run t

steering

orbital

Advertising