Fieldpilot, Pm p m o, Ic & h – TeeJet FieldPilot Install Miller 22xx T T-SS T-ET HT User Manual

Page 11: Prepare the fieldpilot valve, Install the fieldpilot valve bracket

Advertising
background image

9

FieldPilot

®

98-05232 R0

1. PrePare the FieldPilot ValVe

Install adapters

(P)

in the P & T ports. Install adapters

(M)

in the A & B ports. Finally, install adapter

(O)

in the

LS port.
Figure 1-4: Prepare the FieldPilot Valve

p

M

p

M

o

2. install the FieldPilot ValVe Bracket

Identify valve mounting location. Wrap strap

(J)

around main cross over beam so that mounting holes are facing

the tank. Next attach bracket

(I)

, so that mounting holes for the FieldPilot valve are facing the tank, to bracket

(J)

using (2)

(C)

3/8” x 16 x ¾” bolts and (2)

(H)

3/8 nuts as depicted.

Figure 1-5: Install Mounting Bracket for FieldPilot Valve

J

i

C & H

Advertising