Step 4: testing a new battery module, Step 5: disposing of used battery modules – Compaq 2000 User Manual

Page 60

Advertising
background image

5-8 Compaq 2000 Series UPS Operation and Reference Guide

Step 4: Testing a New Battery Module

After installing the new battery module, press the TEST/ALARM RESET
button.

For information on running a self-test, see Chapter 3, “Operation.”

IMPORTANT: The UPS will not execute a self-test until the batteries are 90% charged.

If the installation has been successful, the green Battery Charge indicators
(LEDs 6 to 8) show that the UPS is charging the batteries.

If the installation has not been successful, the Battery Service indicator
(LED 10) will turn red. If this occurs, check the battery connections. If the
Battery Service LED is still red, see Chapter 6, “Troubleshooting,” for more
information.

Step 5: Disposing of Used Battery Modules

The spare battery module kit includes the instructions and packaging required
to return your used battery module to the appropriate location for disposal.

Do not dispose of the used battery module with general office or
household waste. Return the module for proper disposal to
either:

Compaq, authorized Compaq Partners, or their agents.

A recycling center that meets all local environmental
standards.

Advertising