Prior to use – VACUUBRAND DCP 3000 User Manual

Page 31

Advertising
background image

page 31 of 64

Prior to use

Connect the VSK 3000 or VSP 3000 gauge head by its connecting

cable (VACUU•BUS line) to a jack at the rear side of the DCP 3000.

Connect the gauge head to the vacuum chamber via either the small

flange connection, the hose nozzle, or PTFE tubing. Avoid contamina-

tion (oil/oil mist) of the gauge head when generating the vacuum with

an oil-sealed vacuum pump.

+

Do not position the gauge head directly at the inlet of an oil-sealed

pump. The diameter of the connecting tubing should be as large as

possible.

+

Inside a vacuum system where evaporation occurs, e.g., a rotary

evaporator, the vacuum is not uniform. For example, a condenser can

act as a pump, or the vacuum in the connecting tubing can be higher

or lower than in the application itself. This affects the measurement re-

sults. Therefore, carefully choose the position at which to connect the

pressure transducer.

+

Condensate and deposits will affect the measurement results.

+

If residues occur or when working with aggressive or condensable

substances, install a gas washing bottle in front of the pressure trans-

ducer.

+

Position the pressure transducer in such a way that condensate

cannot flow towards it.

VSP 3000:

Recommended orientation: Vertically with vacuum connection pointing

downwards. If mounting the VSP 3000 in any other orientation, a read-

justment is recommended (see section “Readjustment of VSP 3000”, pg.

56).

+

If necessary, clean the gauge head.

Switch the equipment on.

Advertising