Chute control crank assembly, Control lever cable assembly, Assembly (continued) – Troy-Bilt 42000 User Manual

Page 10

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Section

2

:

Assembly (continued)

Chute control crank assembly

1. Cut the tie securing the chute control

crank bracket (L, Fig. 2-5). Remove

the locknut backing screw (K).

2. Position the chute control crank

bracket (L) on the auger housing so

the worm gear meshes with the teeth

in the discharge chute flange.

3. Secure the chute control crank

bracket the to auger housing with the
locknut removed in step 1.

4. Rotate the chute control crank and

check for binding. Adjust, if required,

as follows:

a. Loosen the nut backing bolt (K, Fig.

2-5).,

b. Adjust bracket (L)-(push in to

tighten: pull out to loosen).

c. Retighten the nut backing bolt (K).

d. Check chute rotation and repeat

adjustment as needed.

,5. Apply multi-purpose grease to the

worm gear and toothed edge of

discharge chute flange (M).

Control lever cable assembly

1. Hook the control cable assembly (0,

Fig. 2-6) entering the left side of the

frame into the right control lever (P).
The control cable (0) must be routed

behind cross-member (X).

2. Hook the control cable assembly (0)

entering the right side of the frame
into the left control lever (P and Z).
Control cable (0) must be routed
behind cross-member (X).

10

Advertising