Set-up & Commissioning

Introduction

Touch Pad Control:

Low voltage control featuring touch control options and thermostat, timed delayed starting

and stopping, and dump valve features.

All Low Voltage Controls: Low voltage controls are connected to the air conditioner control box via a 20-metre low

voltage loom.

NOTE: Do not run the low voltage loom in long parallel runs with 240V mains cables. Keep the low voltage

loom 200mm away from any long runs of mains wiring.
Cross over mains wiring at right angles.
Do not use existing access holes in wall cavities where 240V mains wiring exists. Drill a new access

hole 200mm from the existing hole.

Safety

Switch off the power and unplug the unit before touching any wiring or performing any work.

A QUALIFIED ELECTRICIAN must carry out all 240-volt electrical work.

Before Commencing

Packaging

Upon delivery, check that there is no damage to the unit. Any damage should be reported to your local Climate

Technologies office.

Is the control system correct?

Check the customer order to ensure that you have all the correct equipment for installation.