Restore jobsite, Backfilling, Rinse equipment – Ditch Witch RT120 Q User Manual

Page 145: Stow tools, Rt120q operator’s manual

Advertising
background image

Complete the Job - 144

RT120Q Operator’s Manual

Restore Jobsite

CMW

Restore Jobsite

After product is installed, return spoils to the
trench with optional backfill blade.

Backfilling

1.

Position unit at end of trench, several feet
from spoils. Aim tractor at outer edge of
spoils.

2.

Adjust backfill blade to fit land contour.

3.

Move outer edge of spoils toward trench.
Take two or more passes at spoils rather
than moving all spoils at once.

4.

Repeat on other side of trench, if necessary.

5.

Engage float and make final pass over
trench.

Rinse Equipment

Spray water onto equipment to remove dirt and mud.

Stow Tools

Make sure all tools and accessories are loaded and properly secured on trailer.

NOTICE: Do not spray water onto operator’s console. Electrical components could be damaged. Wipe
down instead.

Advertising