East Coast Supercharging ECS Alky C6 User Manual

Page 3

Advertising
background image


Addendum to C6 system.

Before drilling feed hole on tank, first mount pump. Pump
is located rear portion of tank. Optional to have head of

pump be flush with bottom of frame, relocate the tank
mounting screws upward. Or pivot tank on front mounting

bolt and relocate rear bolt.

Hole sizing for tank hole that needs to be drilled is 7/8
diameter. Then rubber grommet inserted.. then barb

pushed in.

Advertising