0 operation – ENMET MX-52 User Manual

Page 15

Advertising
background image

MX52 C

ONTROL

ENMET Corporation

11

5.0 Operation

5.0 Operation

5.0 Operation

5.0 Operation

5.1 Starting Up

5.1.1 Checking the Installation

Ascertain that all connections have been made and that the complete installation complies with current standards in
force.

W

ARNING

:

ENMET Corporation

is not responsible for the compliance of the complete electrical safety system.

The

MX52 C

ONTROL

power input should be protected with circuit breakers provided for that purpose, and that assure

protection of the power unit. The circuit breakers are to be selected according to the power consumption levels
specified by the manufacturer and the length of the electric cables. The circuit breakers can also be used to interrupt
power to the control

Figure 10: Operation Components

Optional
Buzzer switch
See detail 10a below

Programming switch

Item B

Calibration switch

Item C

Keypad area

Item D

On/Off switch

Item A

Display

Detail 10a: Optional Buzzer switch