5. FINAL STEPS

5.1.

SECURE RAMPS TO PLATFORMS:

5.1.1.

After all ramps and platforms have been positioned and all handrails and/or
connectors, and end loops have been installed, ramps must be secured to
platforms with clips (included in MRHP RAMP HANGER PAIR).

5.1.2.

Use two clips at all locations where a ramp meets a platform.

5.1.3.

Position clip so that the long side is as close as possible and parallel to the
ramp side rail and with the clip edge extending onto the ramp side rail by
approximately 5/16

″ (FIG 5.1).

5.1.4.

Drill 1/8

″ pilot holes centered on the ramp side rails and 5/16″ from the edge

of the platform side rail then use the 1/4

″ x 1″ long self-drilling, self-tapping

screws to secure the clip to the platform side rail.

FIG. 5.1

5.2.

TOUCH-UP ARCHITECTURALLY FINISHED HANDRAILS:

5.2.1.

Use sandpaper (180 grit or equivalent) for touching up scratches on
architecturally finished handrails. IMPORTANT: Do not use on painted or
powder coated surfaces.

5.2.2.

Sand in direction of the grain as shown (FIG. 5.2).

FIG. 5.2

5.3.

FINAL CHECKS:

5.3.1.

Ensure that all fasteners are in place and secure.

5.3.2.

Walk on the assembled system, checking for any undue movement.

5.3.3.

Remove any debris and metal chips.

5.3.4.

Ensure that the level and slope has not shifted during installation.

5.3.5.

Check that all handrail ends are covered (either with loops or with end caps).

5.3.6.

CONGRATULATIONS! The EZ-ACCESS® Pathway® System is assembled.