Configuring housing / terminal block connectors – Hatteland Display HT 221 (2U Size) User Manual

Page 17

Advertising
background image

17

General Installation Recommendations

Installation

IND100210-20

Configuring Housing / Terminal Block connectors

Below is a brief illustration that might be useful during configuration and installation of such connectors. You will need

suitable pre-configured cable(s) and tools to configure the connector(s) and cable(s) that are present in your

installation environment. Below is a sample procedure for a 2-pin DC power connector. The procedure is the same for

other connectors of this type as listed in table above. Unit used as illustration below is for reference only.

FIG 3

FIG 1

FIG 2

FIG 4

FIG 1: Unscrew (from top) or make sure that the screw terminal (square area) are fully open, so you can secure the

inserted cables correctly to the loose housing connector (it may already be plugged into the unit as per factory

installation).

FIG 2: Insert cables* (from front) and screw / secure the cables by turning the screw on top of the housing to secure

the cables properly. Check that the cables is firmly in place and do not appear loose or falls out when pulling gently.

*Note: Required polarization verification (for instance -/+ for DC power input) should conform with the markings on

the connector area of the unit. Ignoring the markings on the unit or its add-on modules might damage the unit and/or

external equipment in which end, warranty will be void.

FIG 3: Plug the housing into the appropriate connector area of the unit (glass should be facing down) and check again

that the cables secured conforms with the markings on the connector area of the unit. Finalize the installation by
fasten the screws located in front on each side of the housing connector

(FIG 4).

Advertising