Gate opener installation, 3mounting push-to-open opener to gate, Top view closed position open position – Mighty Mule MM600ET-PRO User Manual

Page 19: Ir v s y, Xf m m

Advertising
background image

16

Assemble post bracket parts. NOTE: A Push-to-Open Bracket
FM148 is required for this type of installation (not included).

I

I

R

V

S

Y

PTO

Bracket

FM148

11”

1

X

X

F

M

M

Q

B

Q

2

2" minimum

pinch-point clearance

2

1

5

Top View

Closed

Position

Open

Position

3

Mounting Push-to-Open Opener to Gate

Attach opener to gate bracket and secure with hardware re-
quired.

Swing gate to OPEN position. Check clearance/binding by inspecting the
alignment. Secure post pivot bracket to post bracket when clearance is OK
in both open and closed positions.

TIP: Turning the pivot bracket over

gives more hole alignment options for the post pivot bracket assembly.

With gate in CLOSED position, using clamps, secure opener to
gate post and center cross member of gate.

Gate Opener Installation

Your Property

Recommended reinforcement and gate bracket mounting
examples.

Steel Pipe Cut in Half

(not supplied)

Gate

Bracket

Thin Walled

Tube Gate

Gate

Bracket

1” x 6” Wood Reinforcement

Panel

Gate

Gate

Bracket

Wood or Metal

Reinforcement

(not supplied)

Mounting Plate

Created for

Decorative Gate

(required but not

supplied)

Remove excess bolt length

with hacksaw or bolt cutters

FRONT VIEW

SIDE VIEW

Reinforcement and Gate Bracket Mounting

2

4

1

Remove clevis pin from the gate bracket and support loose
opener.

If you are installed a pull-to-open gate opener - skip to page 19.

Advertising