Potable water systems cont – WaterFurnace Envision Hydronic User Manual

Page 12

Advertising
background image

12

NSKW INSTALLATION MANUAL

Alternate Hot Water Installation with
Direct Coupling to a Double Wall Unit

P/T
Ports

P/T

Ports

Ball Valve

Dielectric

Unions

Dielectric

Unions

WaterFurnace

NSKW06 (Heating Only)

with Double Wall Load Coax

WaterFurnace

GEOTANK

Ball Valve

HOT

COLD

LOOP FIELD

FLOW CENTER

NOTES:

1) Unions and valves must be installed so that acid flushing

of the heat exchanger is possible.

2) Make sure there is not a check valve in the diptube of the

tank.

3) Route thermistor wires to NSKW. Remove yellow

thermistor wires on TB 3 and 4 from control box and
connect thermistor wires from geothermal storage tank.
Set the pump sampling (PS) in the set up of the control
board to continuously (C) sampling (reference Note 5 in
the Wiring Schematic).

Potable Water Systems cont.