Electrical data, Nskw installation manual – WaterFurnace Envision Hydronic User Manual
Page 16
16
NSKW INSTALLATION MANUAL
NSKW Control Box
Transformer
Run Capacitor
(Single Phase Only)
Ground Lug
Load Pump Relay
Terminal Board
Power Block
Terminal Power Strip
Optional IntelliStart
®
(Single Phase Only)
Compressor Contactor
Power Block
(IntelliStart Only)
Source Pump Relay
Reversing Valve Relay
(Reversible Units Only)
Electrical Data
NOTES: *LRA with optional IntelliStart installed
Type D MCB recommended
Model
Rated
Voltage
Voltage
Min/Max
Compressor
Load
Pump
FLA
Source
Pump
FLA
Total
Unit
FLA
Min
Circ
Amp
Max
Fuse/
HACR
MCC
RLA
LRA
LRA*
06
220-240/50/1
198/264
17.0
10.9
58.0
20.0
1.5
4.5
16.9
19.6
30
380-420/50/3
342/462
7.0
4.5
26.0
-
-
-
4.5
5.6
10
08
220-240/50/1
198/264
27.0
17.3
97.0
34.0
1.5
4.5
23.3
27.6
40
380-420/50/3
342/462
10.0
6.4
45.0
-
-
-
6.4
8.0
10
12
220-240/50/1
198/264
31.5
20.2
126.0
44.0
1.5
4.5
26.2
31.2
50
380-420/50/3
342/462
12.1
7.8
51.5
-
-
-
7.8
9.8
15
17
220-240/50/1
198/264
45.0
29.0
130.0
46.0
1.5
4.5
35.0
42.3
70
380-420/50/3
342/462
19.0
12.2
87.0
-
-
-
12.2
15.3
25
9/26/11