Nskw installation manual – WaterFurnace Envision Hydronic User Manual

Page 14

Advertising
background image

14

NSKW INSTALLATION MANUAL

Hydronic Section cont.

Open the screw 2 turns only in the end of the pump motor
(if Grundfos

®

pumps are used) to allow trapped air to be

discharged and to ensure the motor housing has been
flooded.

Route thermistor wires to NSKW. Remove yellow thermistor
wires on TB 3 and 4 from control box and connect
thermistor wires from geothermal storage tank. Set the
pump sampling (PS) in the set up of the control board to
continuously (C) sampling (reference Note 5 in the Wiring
Schematic).

Adequate rate of flow is very important to system
performance and long term reliability. Follow the guidelines
for recommended flow and pipe sizing in the NSKW
recommendations table.

WaterFurnace Geothermal Storage Tank Thermostat
and Thermistor

Yellow Thermistor Wires Connected to TB (3 and 4) on
NSKW Control Board

NSKW

LOAD PUMP

HYDRONIC

LOAD

Source OUT

P/T
Ports

P/T

Ports

Ball Valve

Dielectric

Unions

Dielectric

Unions

WaterFurnace

NSKW Series

NOTES:
*
A 207 kPa pressure relief valve (Part No: SRV30) should be used in
hydronic applications.
** Vent valve or Pressure/Temperature port at highest point in return line prior to ball valve.

Expansion

Tank

Air

Vent

Pressure

Gauge

207 kPa

RELIEF VALVE

Air

Separator

FROM

HWG

TO

HWG

Back Flow Preventer /

Pressure Relief Valve

Source IN

GEO

STORAGE

TANK

PUMP

HOT

(Piped in

series to

an electric

water heater)

COLD

DOMESTIC

Dip Tube

Ball Valve

Vent Valve or

P/T Port**

Advertising