Event scheduling – Dukane 8755G-RJ User Manual

Page 92

Advertising
background image

26

Event Scheduling

Event Scheduling

• You can schedule the following control events: Power ON/OFF, Input

Source and Transferred Image Display.

• The power on / off event has the lowest priority among the all events that are

defined at the same time.

• There are 3 types of Scheduling, 1) Daily 2) Weekly 3) Specific date (27).

• The priority for scheduled events is as follows 1) Specific date 2) Weekly

3) Daily.

• Up to five specific dates are available for scheduled events. Priority is given to

those with the lower numbers when more than one event has been scheduled

for the same date and time (e.g., ‘Specific date No. 1’ has priority over ‘Specific

date No. ’ and so on).

• Be sure to set the date and time before enabling scheduled events (28).

NOTE

The scheduling function enables to setup scheduled events including power on /

power off. It enables to be “self-management” projector.

Advertising
This manual is related to the following products: