Operation Instructions

SKM 1-03/-04/-05/-06 and 2-03/-04

2

© AXING AG | Switzerland | Reserving change in design and type - We cannot be held liable for printing errors

2014-09-17

 Assembly, installation and service must be carried out by authorized and skilled electricians.
 Switch off facility operating voltage or pull out mains plug before starting assembly or service work.
 Facility assembly:
 In dust-free, dry environment, protected against humidity, vapors, splash water and moisture. In a

location protected against solar radiation. Not within close distance of heat sources. In ambient
temperature of <50°C.

 Ensure sufficient ventilation of the device. Do not cover the ventilation slots! - Avoid short circuits!
 Damages arising from incorrect connection and/or improper operation are excluded from any liability.
 Please observe all relevant standards, regulations and guidelines regarding installation and operation

of antenna facilities.

 Ground SAT headends using equipotential bonding rails according to EN 50083-1,

EN 60728-11:2010.

 Do not carry out any installation and service work during thunderstorms.