Installation and connection – AXING SKM 1-03 User Manual

Page 6

Advertising
background image

Operation Instructions SKM 1-03/-04/-05/-06 and 2-03/-04

Chapterl 2: Installation and connection

6

© AXING AG | Switzerland | Reserving change in design and type - We cannot be held liable for printing errors

2014-09-17

2

Installation and connection

The modulator modules can be mounted either to SKS 4-0x or SKS 8-00 system or stand-alone

2.1

Installation and connection in a headend base unit

If you want to operate the SKM 1-01 on a headends basic unit SKS x-xx, plug the module into the output
combiner (1) and fasten it by screws. Each free slot may be used.
The power supply unit SKZ 5-01 or SKZ 6-00 supplies the module via the active output combiner. Signals
from AUDIO/VIDEO source are fed to Audio/Video inputs of the modules (see Fig. 2).

 For detailed information on the headend base unit, refer to the corresponding operating instructions.
 Before inserting or changing a module, pull the mains plug of the headends basic unit from the socket!

Ground the base plate in order to avoid dangerous overvoltages according to EN 50083-1, EN 60728-
11:2010 (attention: risk of fire/death).

 It is not possible to insert two single modules side by side in the basic unit.
 The SKM 1-07 cannot be used in combination with a headend base unit.

Fig. 3: Installation and connection
in a headend base unit

Notes

Advertising
This manual is related to the following products: