3.

SAMPLING

Asbestos clearance procedures can be found in MDHS 39.

Guidelines suggest that static monitoring should be carried out at 1 -

2 metres above ground level, an appropriate mast is available from CASELLA

CEL, as shown in the diagram.

Note :- The sampler should never be run without a filter on the inlet.

3.1

Check List Before Sampling

1.

Make sure the battery has been fully charged.

2.

Ensure that the sampling head is correctly fitted with no leaks.

3.

If the flow rate cannot be obtained with similar conditions to previous

occasions, a leakage may be present.

Sampling mast

To pump inlet

Sampling head

Pump with static sampling mast