Maximum demand variable, Period of maximum demand integration – CIRCUTOR CVM-C5 Series User Manual

Page 29

Advertising
background image

If the value entered is greater than the maximum programming value, the digits flash for 2

seconds and the programmed value is deleted.

Maximum programming value: 9.999.

Minimum programming value: 0.

4�6�10� Maximum demand variable

On this screen the variables to integrate into the Maximum

Demand concept are selected.

The display shows the digits that identify that code for the

variable to be integrated according to

Table 10

Table 10: Codes for maximum demand variables

Parameter

Code

Active three-phase power

16

Apparent three-phase power

34

Three-phase current

36

None

00

The

key jumps between the different options.

To validate the information and go to the next programming step, press

.

4�6�11� Period of maximum demand integration

On this screen the maximum demand integration period is

programmed.

To enter or modify the integration period value, press the

key

repeatedly, increasing the value of the flashing digit.
When the on-screen value is that desired, press the

key to

go to the next digit to modify the other values.

If you press the

key after changing the last digit, it will jump back to the first digit so you

can modify the previously programmed values again.

The integration period may range from 1 to 60 minutes.
To validate the information and go to the next programming step, press

.

If the value entered is greater than the maximum programming value, the digits flash for 2

seconds and the programmed value is deleted.

29

Instruction Manual

CVM-C5

Advertising