Finish the site survey, Mount the cs on the wall – D-Link KX-TDA100 User Manual

Page 148

Advertising
background image

2.8 Connection of DECT Portable Stations

148

Installation Manual

e.

Make sure that the radio signal strength level is greater than "3" at any location within the service
area demanded by the user.

4. Finish the site survey

Refer to "2.8.6 After Site Survey".

a.

Return all DIP switches of each CS to the OFF position, and stop supplying power.

b.

Turn off the PS.

5. Connect the CS and PS to the Hybrid IP-PBX and test the operation

Refer to "2.8.7 Connecting a Cell Station to the Hybrid IP-PBX".

a.

Connect the CSs to the Hybrid IP-PBX.

b.

Register the PSs to the Hybrid IP-PBX.

c.

Walk around the service area while having a conversation using a registered PS. If noise is
frequent or conversations disconnect, relocate the CSs or install an additional CS.

6. Mount the CS on the wall

Refer to "2.8.8 Wall Mounting".

a.

Assuming everything goes as planned, mount the CS on the wall.

Advertising