Factory settings, Application coordination, Factory settings -4 – Basler Electric BE1-50/51B-218 User Manual

Page 36: Application coordination -4

Advertising
background image

4.03

4.03

.31

.75

6.19

(19.1)

(7.9)

(102.4)

(102.4)

(157.2)

10-32 SCREWS

MOUNTING PANEL

.25

(6.4)

A

A

5/16-18 STUD

2 PLACES

TERMINAL EXTENSION (TYP.)
FOR DETAILED INSTRUCTIONS.
SEE THE TERMINAL PROJECTION
MOUNTING KIT SUPPLIED.

MOUNTING PANEL

(62.48)

2.195

(55.75)

(49.53)

1.95

2.40

DETAIL A-A

SHOWING THE ADDITION OF WASHERS

OVER THE BOSS TO TIGHTEN THE

RELAY AGAINST THE PANEL.

CASE

PANEL

12-17-99

D2750-25

NOTE: PROJECTION MOUNT USES WASHERS OVER THE BOSSES AS SHOWN IN THIS ILLUSTRATION.

Figure 4-4. Outline Dimensions for S1 Case, Projection Mounting

FACTORY SETTINGS

Factory settings for the internal switches of SW3 are as follows:

 SW3-1 — OFF (60 hertz operation).
 SW3-2 — OFF (0.0 additional fixed delay for the instantaneous element).
 SW3-3 — ON (GE IAC type characteristic curves).
 SW3-4 — ON (Integrating reset characteristics).

APPLICATION COORDINATION

In a typical application coordination scheme, a BE1-50/51B-218 or BE1-50/51B-228 is being used to
provide primary protection for a radial distribution feeder. An electromechanical overcurrent relay with
extremely inverse timing provides protection for the transformer and bus. To improve coordination with
the electromechanical relay, the BE1 relay with integrating reset characteristic has the time characteristic

4-4 BE1-50/51B-218/-228

Installation 9252000995

Rev

H

Advertising
This manual is related to the following products: