Revision history – Basler Electric BE1-50/51B-218 User Manual

Page 5

Advertising
background image

9252000995 Rev H

BE1-50/51B-218/-228 Introduction iii

REVISION HISTORY

The following information provides a historical summary of the changes made to this instruction manual
(9252000995). Revisions are listed in reverse chronological order.

Manual

Revision and Date

Change

H, 01/09

 Updated

Storage statement in Section 4.

 Modified Figure 5-2, Target Operational Test Setup.
 In Section 5, modified Target Test so that TIME and INST targets

can be verified independently from each other.

 Minor text edits throughout manual.

G, 03/08

 Updated front panel drawings to show new reset button.
 Updated descriptions of targets and reset button.

F, 01/07

 Moved Time Characteristic Curve Figures to Appendix A.
 Added manual part number and revision to footers.

E, 12/06

 Updated Figure 4-1, Outline Dimensions for Case S1.
 Updated Figure 4-2, Panel Drilling Diagram for Case S1.
 Moved Revision History to the front of manual.

D, 02/03

 Changed manual to cover the BE1-50/51B-228 in addition to the

BE1-50/51B-218.

 Re-organized the specifications in Section 1.

C, 12/00

 Updated drawings in Section 2 to reflect changes to the PC board.
 Also updated the rest of the manual to reflect the change in switch

call out from SW8 to SW3.

 Added new functionality to the PICKUP LED. It is now the

ACTIVE/PICKUP LED and will be green when active and red when
picked up.

B, 12/99

 Changed all references to target test current to one ampere

alternating current.

A, 05/98

 Added Patent number to Specifications. Changed manual format to

reflect the current style.

—, 03/96

 Initial

release

Advertising
This manual is related to the following products: