Comtech EF Data LBC-4000 User Manual

Page 32

Advertising
background image

LBC-4000 L-Band Up/Down Converter System with Ethernet

Revision 2

Installation

MN-LBC4000A

2–6

2.2.2 Installing the Optional Side-Mounting Bearingless Rack Slide Set

The  optional  Bearingless  Rack  Slide  Set  may  be  installed  into  the  equipment  rack  cabinet  and 
onto the sides of the LBC‐4000 as shown in Figure 2‐4 and per the following procedure: 

 

Step

Task

1

Use the provided mounting hardware to install one slide onto each side of the LBC-4000
chassis.

2

Use the provided mounting hardware to install the slide rail components into each interior
side of the equipment rack cabinet.

3

Mount the unit into the front of the equipment rack. Ensure that the slides properly engage
the cabinet-mounted slide rails.

4

Continue to slide the converter into the equipment rack to its final operating position. Then,
use four user-provided screws to secure the converter to the equipment rack’s right and
left threaded front mounting rails (through the front panel mounting slots).

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

CEFD Part Number

Description

FP/SL0007

Bearingless Rack Slide Set – 22”

FP/SL0008

Bearingless Rack Slide Set – 24”

FP/SL0006

Bearingless Rack Slide Set – 26”

 

Figure 2-4. Installing the Optional Side-Mounting Bearingless Rack Slide Set

Advertising