INSTALLATION

7

INSTALLATION

Figure 13: Lift line attached to clip

Figure 12: Set clip into the backbone channel

Figure 15: Rod through beam clamp

Figure 14: Beam clamps with hoist

Using Hoist Lifting Clips

Daktronics supplies hoist lifting clips with each
hoist installation. The hoist lifting clips install
into the backbone to connect the hoist to the
lifting cables.

Figure 12 shows a clip in the backbone
channel prior to being rotated into the proper
lifting position then locked into the channel.

Verify that the bolts are set and the clip can
not slip out of the backbone channel. Prior to
lifting, torque the bolts to 10ft/lb to secure
the clips.

Directly attach lift lines to the hoist lifting clip
with a 3/16" thimble and Nicopress swage
(Figure 13).

Each installation is unique. Pre-measure the wire
rope to be sure to have enough to go the total
distance of the lift.

Attaching the Backbone Stiffeners

Most Vortek hoist installations require the use
of backbone stiffeners. There may, however,
be three sets of beam clamps instead. Refer to
Figure 14. For 3-beam installations, skip the
following steps and begin mounting the hoist.

For 2-beam installations, there will be two
aluminum backbone stiffeners located on top of
the hoist with two 3/8" threaded rods, 4 nuts
and two steel clamps. Assemble them to the
hoist as follows:

1. Turn the backbone stiffener on edge with

the chamfered corner down and towards

the beam clamps then slide under the

center lip of the backbone. Repeat

this process for the opposing side.

2. Run the threaded rod through the beam

clamp while threading the nut onto the lead
end (Figure 15). Continue pushing the
rod into the hole on the backbone stiffener
and start threading the second nut onto the
lead end. The threaded rod will run into
and through the second beam clamp.