Flowserve PSS III Durametallic User Manual

Page 15

Advertising
background image

15

14.4 Push the stationary face radially into the gland and then down as

the lock pin slips into the lock pin slot. The stationary face should

sit flat on the spring holder.

14.5 Repeat this procedure for the other gland half.
14.6 Lubricate the exposed split joint gasket surfaces with silicon grease.
14.7 Wipe the stationary faces clean with alcohol.
Caution: Consult material safety data sheets for proper handling of

alcohol.

For proper seal installation, please refer to Flowserve publication

FIS175eng, PSS III Installation Instructions.

Figure 34

14.2 With the gland half sitting on the bench, position the stationary face

over the spring holder as shown in Figure 34.

Figure 35

14.3 Align the lock pin a with the lock pin slot. See Figure 35.

Advertising