Operation, Normal operation, Continuous boiler blowdown – Flowserve LRR1-40 TDS Control Unit User Manual

Page 22: Intermittent boiler blowdown

Advertising
background image

22

Operation

Normal operation

LED "Power" is illumin

ated

.

LEDs 1 - 4 are not illumin

ated

, the conductivity

electrode is immersed.

Continuous boiler blowdown

LED "Power" is illumin

ated

.

LED 2 is flashing while the continuous blowdown
valve is closing.

LED 3 is flashing while the valve is opening.

Intermittent boiler blowdown

Only applicable if Automatic Intermittent Blowdown Control was activated:

Upon application of mains voltage the timed intermittent blowdown interval (time between
intermittent blowdowns) is started.

During the time-controlled blowdown pulse the automatic intermittent boiler blowdown
takes place:

LED "Power" is illuminated.

LED 4 is lit during intermittent blowdown and relay
contact 4 is closed. The intermittent blowdown valve
opens.

Test

Test

Note

LEDs 2 and 3 go out once the valve position dictated by continuous
blowdown control is reached.

Test

Note

LED is not lit during the timed interval between intermittent boiler blowdowns.
Relay contact 4 is open, the intermittent blowdown valve is closed.

Advertising