Electrical Connections
Connect electrical lines sized for the correct voltage,
current and phase of the machine. These should
agree with machine requirements indicated on the
nameplate and labels in control panel.

On machines not provided with a single-point con-
nection there is an electrical connection required for
the, 1. Pumps and control circuit, 2. Wash tank
heaters (electric heat only) and, 3. Rinse tank heat-
ers (electric only).

Machines provided with a single-point connection
require one electrical connection in the control panel
for all functions excluding the booster.

Adjust the compression spring located on the con-
veyor overload shutoff mechanism. This can be
found on the unload end of the machine under the
mechanism guard. There is sticker marked with the
factory test setting of the spring. Adjust to this point
then run the conveyor full of ware. If the machine
does not shut down the adjustment is set. If it does
shut down adjust the spring tighter until the machine
runs continuously.

þ

NOTE:

Use a silicone caulking between the sections in
addition to the gasketing material provided.
This will minimize the possibility of leaks.

þ

NOTE:

In each case connections must be made to a
circuit breaker or fused disconnect as provided
by the end-user and required by local codes.
A wiring diagram is supplied inside the control
panel. Please return diagram when finished.

Electrical termination points are also required be-
tween each of the sections in the termination box
located on the frame in the rear of the machine near
where the sections meet.

þ

NOTE:

As with any 3 phase system, an electrician
should check all motors for proper phasing,
i.e., Pump motors must be running in direction
indicated by arrow on housing.

INSTALLATION INSTRUCTIONS

Placement
Carefully uncrate machine.

Bolt the three sections together.

Mechanical Requirements
Connect 140

ºF and 180ºF water supply to the tank

and final rinse feeds respectively as tagged on the
machines and noted on the installation drawing.

If machine is provided with steam heat connect the
steam lines and steam condensate lines as tagged
and noted on installation drawings.

Connect the drain lines.

þ

NOTE:

All lines should be flushed prior to use to
remove debris.

þ

NOTE:

Do not reduce the size of lines as specified in
installation drawings. All lines are sized to
facilitate necessary flows, pressures, etc.

PART 2 INSTALLATION INSTRUCTIONS

þ

NOTE:

Drain lines must be as specified on installation
drawings. Drain line should be properly vented
and should have fall of not less than ¼” to the
foot of proper flow. Some area plumbing codes
require drains to flow into an open gap with an
opening twice the diameter of the pipe. Check
with your local plumbing codes for the type of
drain connection required.

Clipper/Master RC DOC FLT-CLPMST 1.0 04

www.insingermachine.com 800-344-4802