MBM Corporation 307A (PERF & SCORING UNIT) User Manual

Page 14

Advertising
background image

13









(6) Place Transportation Rollers where they grip perforating sheet positively.

The two Perforation Units should not touch each other.





























NOTE

Position where perforation can be done is only between the two Lower

Transportation Rollers.

(4) Add another Blade Receipt Roller to the Shaft and re-mount Lower Transportation

Roller. Then, fix Rollers by screws. Fix the Phillips Screw at end of the Shaft.

(5) Add another Perforation Unit to the Block Mounting Arm and fix by Thumb Screw.

Seen as two Perforation Units are mounted.

Seen as two Perforation Units are mounted.

Advertising