Installation, Vertical vent installations – Montigo M38DV PRC User Manual

Page 7

Advertising
background image

Page 

XG0204 04/05

Panorama Direct Vented Fireplace

Installation

Vertical Vent Installations

Vertical Terminations must be installed:

minimum 2' (two feet) above the highest point where

vent passes through the roof.

minimum 6' (six feet) from a mechanical air inlet

minimum 18" (1 1/2 feet) from a parapet wall.

Maximum vent height is 30 feet above fireplace.

Note: Flame characteristics will change if the maximum vent

height is used.

Minimum clearances 2" from vent to all combustible materials

must be maintained.

A maximum of two offsets (each offset has two 90° bends) may

be made if the length of the offsets does not exceed 25% of the
vertical vent height, when measured center to center of piping.

Example:

Typical vent installation.

30' vertical vent

2 - 2' offsets required

25% of 30' = 7-1/2' max. offset allowed

This venting configuration meets requirements.

A - Termination

PVTK-1

B - Flex sections

PFL-1 (12" section)

PFL-2 (24" section)

PFL-3 (36" section)

PFL-4 (48" section)

C - Solid sections

PEXT-1 (12" section)

PEXT-2 (24" section)

PEXT-3 (36" section)

PEXT-4 (48" section)

D - Support Ring & Plate

PSPXT-7 (8" dia.)

E - Firestop

PS-8 (8" dia.)

F - Roof Flashing

PRF-7 (1/12 - 7/12 pitch)

PRF-12 (7/12 - 12/12 pt.)

Figure 10.

Straight, vertical venting. Using the required PXT-10 adap-

tor.

Figure 12.

Vertical venting using 2 offsets (1 offset= two 90° bends).

Figure 11.

Vertical venting with 1 offset Vertical venting with 1 offset

(1 offset= two 90° bends).

Advertising