Installation procedures – Thermon PCS-COM User Manual

Page 4

Advertising
background image

3

1.8.

Cut and remove primary insulation jacket.

1.9.

Skive outside of black matrix.

1.10.

Cut v-notch in matrix and pull bus wires

from matrix. Cut and remove center

matrix.

Do not cut bus wire strands.

1.11.

Apply a liberal amount of RTV sealant to

cable.

1.12.

Slide boot onto the end of the cable.

117mm

(4-5/8”)

Bus Wire

Primary Insulation

1.7.

Gently score the aluminium foil layer and

peel away. (HSX cables only).

2.1.

Cut and remove heating cable overjacket.

2.2.

Trim ends of braid. Gently score the

aluminium foil layer (HSX cable only) and
peel away.

13mm

(1/2”)

Cable

Overjacket

2.3.

Apply a liberal amount of RTV sealant to

cable and inside end cap. Slide end cap

onto end of cable. For FLX-OJ or HSX

proceed to Step 5.1 on page 6.

End Termination for FLX-OJ Cables and HSX Cables. For Cables with Braid Only, Skip to Step 4.1 on page 5

Aluminium Foil

(HSX Cable Only)

Matrix

Aluminium Foil

(HSX Cable Only)

ET-6

INSTALLATION PROCEDURES

Advertising