Maintenance, Preventative maintenance schedule, Chapter 5 – AEC VacTrac Series Conveying Systems User Manual

Page 86: Chapter 5: maintenance, 1 preventative maintenance schedule, Every week

Advertising
background image

Chapter 5: Maintenance

5-1 Preventative Maintenance Schedule

The checklist below contains a list of items which should be inspected and/or replaced to
keep the mechanical components of your conveying system operating at peak efficiency.
Perform each inspection at the regular intervals listed below.

System model #

Serial #

Every week

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Inspect all filters for
wear, replace/
clean if dirty or
worn.

Check to make
sure that all hose
connections are
air tight.

Every month Jan Feb Mar Apr May Jun

Jul Aug Sep Oct Nov Dec

Lock out electrical
power and inspect
electrical wiring for
integrity.

Check demand
sensor.

Inspect gaskets at
hoppers.

Inspect belt(s).

Oil & grease
(lubricate)
components


- Photocopy this page for your maintenance records -

Conveying System Mechanical Components Chapter 5: Maintenance

85 of 136

Advertising