Electric winch vertical mast operation, Auxiliary handle – Allmand Nite-Lite Pro Vertical Tower V Series User Manual

Page 9

Advertising
background image

8

8

9

1. Remove the electrical power from the

winch by shutting the circuit breaker
off and the engine off.

2. Insert the handle so that it completely

engages with the driveshaft. The
handle can be cranked in either di-
rection with the clutch in the engaged
position.

3. Always remove the handle from the

winch after use.

ELECTRIC WINCH VERTICAL MAST OPERATION

VISUALLY INSPECT EQUIPMENT FOR
DAMAGE BEFORE OPERATING. ALLOW
ADEQUATE CLEARANCE AROUND TRAIL-
ER FOR TOWER AND INSURE THAT NO
PERSONS ARE STANDING UNDER THE
LIGHTS WHEN LOWERING.

TO LOWER TOWER AND LIGHTS

1. Turn off lights.

2. Operate the electric winch switch in

the down position to lower the lights
to the lowest vertical position.

3. Stop engine.

4. Rotate the light bar in to the transport

park position (in line with trailer) and
engage the park pin by twisting on
the park pin ring until the plunger is
released and the pin engages the
hole in the light bar.

5. Reposition the lamp fixtures for

transport by pulling them down into
the lowest position and face the

fixtures toward the center of the
trailer.

6. Remove ground rod from earth.

Disconnect wire from ground lug and
secure in trailer

7. Raise jacks and rear stand, retract

outriggers and secure for towing

SAFETY WARNING

!

6. Operate the electric winch switch to the

“up” position to raise tower to the de-
sired height.

7. If lights need to be adjusted for better

lighting of the work zone after raising the
tower, lower the tower using the “down”
switch position and make desired adjust-

ments to the light bar and light fixtures.
Raise the tower into position. Repeat
this step if necessary.

NOTE: Ensure the detent pins are prop-

erly engaged in the outriggers before

towing.

AUXILIARY HANDLE

An emergency crank handle is provided