Optima 40 - sb – Archgard 40-DVI40N User Manual

Page 12

Advertising
background image

Optima 40 - SB

12

Instructions for use with Archgard vertical termination cap. Part # 999-INS-TK. Install the termi-
nation cap being sure to provided sufficient space (around and on top) so as to not to impede the
flow of air both into and out-of the cap. This cap is only to be used for non combustible installa-
tions. Do not recess into the top of the chimney.

1. Mark each end of one liner with “Air Intake”.
2. Mark each end of the second liner with “Exhaust”.
3. Pull the liner through the chimney.
4. Install the flashing. Do Not bend or cut the flashing in any way.
5. Seal and attach the liner marked “Air Intake” to the vent terminal pipe marked “Air Intake” with the collar

clamp provided.

6. Seal and attach the liner marked “Exhaust” to the vent terminal pipe marked “Exhaust” with the collar clamp

provided.

7. Seal and attach the end of the flex marked “Air Intake” to the collar marked “Air Intake” on the appliance with

the collar clamp provided with the unit.

8. Caulk all joints as usual.

NOTE: The vertical termination cap must be sealed to the liner with suitable high temperature sealant and with the
hose clamps fasteners provided. The liners must form a complete connection from the appliance

flue collars to the

vertical termination cap.

VENTING INSTRUCTIONS 999-INS-TK

The minimum flue (chimney) size required to run the two 3” (76 mm) is 4” x 7” (100 mm X 178 mm)

Front view of

DV Insert

Air Intake

Collar

3” (76 mm)
Flex Liner

Fresh Air
Intake

Min. vent height 8’ (2.44 M)
Max. vent height 35’ (10.6 M)

Vertical Termination
cap Part # 999-INS-TK

Exhaust

Collar

Exhaust

Advertising
This manual is related to the following products: