Optima 40 - sb – Archgard 40-DVI40N User Manual

Page 23

Advertising
background image

Optima 40 - SB

23

INITIAL OPERATION

1. Check that the appliance is properly vented and connected to the gas supply.
2. Check that the logs and branches are properly placed.
3. Check that all external parts, such as grills, door and faceplate are properly attached and

fastened.

4. Do not operate this appliance with broken, cracked glass doors or without the door (s) in its

correct (and latched) position. Do not abuse the glass by either striking or slamming shut.

5. Check that there are no fingerprints left on plated surfaces or glass panels, as high

temperature can bake these prints onto the surface permanently.

FINAL INSTALLATION CHECK

Each Archgard Gas Fireplace is checked and tested at the factory prior to being packaged, and
shipped to our dealers, and finally installed in your home. Archgard recommends that before
leaving this unit with the customer, the installer must ensure that the appliance is firing cor-
rectly, and that the electrical system is in working order. This will include:

1. Perform leak tests of supply line, gas control valve, supply line from gas control valve and

pilot assembly.

2. Clocking the appliance to ensure the correct firing rate (see page 9 of this manual).
3. If required, adjusting the primary air to burner to ensure that the flame does not carbon or

soot. (see page 29 of this manual) .

4. Check for proper operation including correct drafting.
5. The FAN system should be turned ON for a minimum of 10-15 minutes to ensure the fan,

rheostat and fan sensor are all working correctly. After the system has been checked, and
confirmed that the fan components are in working order, turn the fan system OFF and refer
to the instructions for FIRST FIRE located in this manual.


As a reminder, a TAG is attached to all of our gas fireplaces. This TAG is located at the gas
control valve. See Fig 1.

Any alteration to the product that causes carboning or sooting that results in any
damage or requires cleaning is not the responsibility of the manufacturer.

ARCHGARD INDUSTRIES LTD.

*** INSTALLER ***

IMPORTANT NOTICE

ALL GAS AND ELECTRICAL CONNECTIONS

** MUST ** BE CHECKED AND TESTED AT

TIME OF INSTALLATION.

Fig 1.

Advertising
This manual is related to the following products: