Installation, Functional test – Emerson 7ADTB User Manual

Page 4

Advertising
background image

INSTALLATION

(continued)

1---2

Engine Starting Contacts

All customer connections, including the engine control
contact connections, are located on terminal block TB
which is mounted on the top right side of the enclosure.
Refer to the wiring diagram provided with the automatic
transfer switch and connect the engine start wires to the
appropriate terminals. See Figure 1–1 and Table A.

Table A. Engine start connections.

When normal source

fails

Terminals on

Terminal Block TB

contact closes

TB1 and TB2

contact opens

TB1 and TB3

Note:

To temporarily disable engine control from

the automatic transfer switch you can unplug J3
from the small P3 receptacle at the bottom of the
assembly. Be sure to reconnect plug J3 to the P3
receptacle for automatic transfer switch operation.

Auxiliary Circuits

Connect auxiliary circuit wires to appropriate terminals
on transfer switch terminal block TB as shown on the
wiring diagram provided with this automatic transfer
switch.

engine start

connections

on

customer

terminal

block TB

Figure 1-1. Customer terminal block on the top right

side of the enclosure.

Functional Test

The Functional Test consists of two checks:

1 — Voltage Checks, page 1–3

2 — Electrical Operation, page 1–4

Do these checks in the order presented

to avoid damaging the 7ADTB.

Read all instructions on the Wiring Diagram and labels
affixed to the automatic transfer & bypass–isolation
switch. Note the control features that are provided and
review their operation before proceeding.

Continue to 1 – Voltage Checks on next page.

Advertising