Installation, Functional test, Continued) – Emerson 7ADTB User Manual

Page 5: 1 – voltage checks

Advertising
background image

INSTALLATION

(continued)

1---3

RED

RED

GREEN

GREEN

observe

these lights

AMBER

Figure 1-2. Standard controls and indicators.

Functional Test

Read all instructions on the Wiring Diagrams and labels
affixed to the 7ADTB. Note the control features that are
provided and review their operation before proceeding.
After installing the 7ADTB check the following:

– Bypass Handle should be in the NORMAL position.
– Isolation Handle should be in the CONN position.
– CN transfer switch should be C (closed)
– CE transfer switch should be O (open)

If handles are not in correct positions, follow instructions
for Bypassing and Isolating the automatic transfer switch
in Section 3. Do not force the handles. Electrical
interlocks prevent a wrong sequence of operation.

1 – Voltage Checks

First check nameplate on transfer switch; rated voltage
must be the same as normal and emergency line voltages.

Use extreme caution when using a meter

to measure voltages. Do not touch power

terminals; shock, burns, or death could result !

Perform steps 1–6 at the right. Observe the status lights.
See Figure 1–2.

Black square means light is on.

White square means light is off.

* If necessary, adjust voltage regulator on generator per the
manufacturer’s recommendations. The 7ADTB will respond only
to rated voltage specified on the nameplate.

Now continue to 2 – Electrical Operation on next page.

1

Close the normal source circuit

breaker. The Transfer Switch

Connected To Normal and the

Normal Source Accepted lights

should come on.

Load

Disconnect

Active

2

Use an accurate voltmeter to

check phase to phase and

phase to neutral voltages pres-

ent at the transfer switch normal

source terminals.

3

Close the emergency source

circuit breaker. (Start generator,

if necessary.) The Transfer

Switch Connected To Normal &

Emergency Source Accepted

lights should come on.

Load

Disconnect

Active

4

Use an accurate voltmeter to

check phase to phase and

phase to neutral voltages pres-

ent at the transfer switch emer-

gency source terminals.*

5

Use a phase rotation meter to

check phase rotation of emer-

gency source; it must be the

same as the normal source.

A B C

6

Shut down the engine–genera-

tor, if applicable. The Emergen-

cy Source Accepted light should

go off. Then put the starting

control selector switch (on the

generator set) in the automatic

position. Close enclosure door.

Load

Disconnect

Active

Advertising