Emerson Process Management Bristol Series 9110 User Manual

Page 21

Advertising
background image

CI-9110 2-3

Installation

shutoff valve allows the supply source to be closed down during maintenance checks
without disturbing other equipment operating on the line.

Figure 2-2 - Regulator Assembly

2.3.2 Moisture in Lines


The Regulator should be installed so that the supply and output lines slope downward and
away. This arrangement allows any condensate trapped in the lines to drain away from the
instrument.

Advertising
This manual is related to the following products: