Introduction

2

2.0

I

NTRODUCTION

2.1

References

This document must be used together with site specific documentation and documentation for other

parts of the system.

2.2

Pre-Installation Checks

• Check the received materials to be sure all required assemblies and parts have been received. If

you discover any external damage, report it to the shipping company and your local Emerson rep-

resentative.

2.3

Packing List

• User manual (this document)
• Liebert XDR module

2.4

Installation Considerations

The Liebert XDR is designed for attachment to the rear of computer cabinets in the data center. See

4.0 - Mechanical Considerations for details.

2.4.1 Room Preparation

The room should be well-insulated and must have a sealed vapor barrier. The vapor barrier in the

ceiling and walls can be a polyethylene film. Paint on concrete walls and floors should contain either

rubber or plastic.

Outside or fresh air should be kept to a minimum when temperature and humidity must be tightly

controlled. Outside air adds to the cooling, heating, dehumidifying and humidifying loads of the site.

Doors should be properly sealed to minimize leaks and should not contain ventilation grilles.

NOTE
The vapor barrier is the single most important requirement for maintaining environmental

control in the conditioned space.