Adjustment, 6 hot gas bypass valve, Operation – Emerson Liebert Deluxe System/3 DH User Manual

Page 61: Figure 7 hot gas bypass, Hot gas bypass valve, Figure 7, Hot gas bypass

Advertising
background image

Component Operation and Maintenance, Checks and Adjustments

53

Adjustment

To adjust the superheat setting, proceed as follows:
1. Remove the valve cap at the bottom of the valve.
2. Turn the adjusting stem counterclockwise to lower the superheat.
3. Turn the adjusting stem clockwise to increase the superheat.

7.4.6 Hot Gas Bypass Valve

Operation

The hot gas bypass is inserted between the compressor discharge line and the leaving side of the

expansion valve through the side outlet distributor (refer to Figure 7). The system, during normal

operation, when the evaporator is under full load, will maintain enough pressure on the leaving side

of the hot gas valve to keep the valve port closed.
If the load on the evaporator decreases, the evaporator will get colder. When the coil is too cold, the

internal pressure in the evaporator drops and allows the hot gas bypass valve to open. Hot gas then

mixes with the liquid coolant on the discharge side of the expansion valve, raising the temperature

and pressure in the evaporator. The net result is a reduction in the cooling capacity of the unit to

match the load.

Adjustment

Upon deciding what evaporator temperature is desired, the following procedure should be used to

adjust the hot gas bypass valve:
1. Install the suction and discharge pressure gauge.
2. Turn thermostat to call for cooling so that the refrigeration compressor will run.
3. Remove the TOP adjusting nut from the valve.
4. Insert an Allen wrench in the brass hole at top of valve in adjusting port, and turn CLOCKWISE

if a higher evaporator temperature is required.

5. After obtaining the suction pressure required, reinstall cap tightly making sure there are no

leaks.

6. Let the evaporator operate for approximately 10 to 15 minutes to make sure the suction pressure

is within the range desired.

7. There will be a fluctuation of approximately 3 to 6 PSIG (21 to 41 kPa) on the evaporator due to

the differential on the hot gas bypass.

Figure 7

Hot gas bypass

NOTE
Make no more than one turn of the stem at a time. As long as thirty minutes may be required

for the new balance to take place.

Solenoid Valve

Condenser

Compressor

Discharge

Bypass Valve

TEV

Side Distribution

Connector or ASC

Hot Gas

Solenoid Valve

Evaporator

External

Equalizer

External Equalizer