Installation and assembly, Preparation and unpacking – MCZ Stub User Manual

Page 22

Advertising
background image

A

B

20

4-INSTALLATION AND ASSEMBLY

IMPORTANT!

The product must be installed and connected to the product by a qualified technician or competent personnel in

order for all local or national regulations to be complied with and in any case in accordance with UNI 10683.

When the product and the relative frame are unpacked, verify that every part is in perfect working order and no damage has been caused

during transport. If the product is installed in a place that is difficult to access, the weight can be reduced by removing the internal

elements of the firebox. It is recommended to reposition each element correctly.

PREPARATION AND UNPACKING

The product is supplied on pallets with various packaging.

• One contains the structure of Fig. 1.

• A pallet containing the refractory parts, a cardboard box with the sides, a box with the ceramics and a box with the top Fig.2/3.

Open the package and remove the boxes. Once the package is open, remove the two brackets that block the product to the pallet (Fig.4).

Remove the two screws Aand the other three screws B that block the bracket to the pallet and set the product in the pre-selected place,

making sure this complies with the requirements.

FIG. 1 - STUB STRUCTURE PACKAGE

FIG. 2 – PACKAGE CONTAINING REFRACTORY

PARTS AND BOX WITH SIDES, CERAMICS

AND TOP (STUB OVERNIGHT)

FIG. 4 - REMOVING THE PACKAGE SCREWS

FIG. 3 – PACKAGE CONTAINING REFRACTORY

PARTS AND BOX WITH SIDES, CERAMICS

AND TOP (STUB)

Advertising
This manual is related to the following products: