Stub coating assembly – MCZ Stub User Manual

Page 32

Advertising
background image

G

F

B

B

B

B

S

30

7-STUB COATING ASSEMBLY

FIG.5 SIDE PANELS ASSEMBLY

FIG.6 SIDE PANELS ASSEMBLY

Before going ahead with the installation of the side panels, it is necessary to centre and secure the air adjustment knob. Use one hand to

hold the knob in axis (at the front) and with the other hand tighten the screw at the back of the stove.

Side panels assembly.

As with the central panel, fix the metal structure “F/G” to the ceramic “B” via the eight screws “C”. The metal panel on the handle side has

a cut-out (detail A). Position the upper ceramic “B” facing with the cut-out (detail B) on the same side as the cut-out of the metal frame

and then towards the door opening. While the lower ceramic and the two ceramics on the side opposite the door opening must have the

cut-out on the rear part (FIG.5 detail B). After mounting the panels, insert them in the pin S (fig.6) located at the back at the bottom of the

Advertising
This manual is related to the following products: