Installing the Hardware

26

Enterasys Xpedition 2000 Getting Started Guide

Installing the Chassis

Enterasys recommends that only qualified personnel conduct installation of any XP chassis.

Warning

: Before performing any upgrade or installation procedures, ensure that the

XP-2000 is powered off.

This section contains procedures for the following types of installation:

Table-top installation

Rack mount installation

Table-Top Installation

You can install the XP-2000 on a tabletop.

1.

Select a table that is stable (not wobbly) and is not in an area subject to frequent foot traffic.
Remember that you will be attaching numerous cables to the XP-2000.

2.

Place the XP-2000 on the table, allowing at least 3” of space on each side for adequate air flow
to the cooling fans.

Rack Mount Installation

You can install the XP-2000 in a standard 19” equipment rack. The XP-2000 chassis contains screw
holes for front-mounting brackets.

Note:

Never attempt to rack mount the XP-2000 unaided. Ask an assistant to help you hold the
chassis.

To install the XP-2000 chassis in an equipment rack, use the following procedure. You need a
phillips-head screwdriver to perform this procedure.

Figure 9

shows an example of how to install the XP-2000 in an equipment rack. The procedure

following the figure describes how to install the XP-2000 in an equipment rack.