Attaching the console management cables – Enterasys Networks X-Pedition 2000 User Manual

Page 47

Advertising
background image

Enterasys Xpedition 2000 Getting Started Guide

31

Installing the Hardware

Caution

: The female and male connectors for the expansion modules are not keyed, so it is possible

to misalign the connection. Ensure that all pins fit properly into the female connector on the
expansion module before applying power to the XP-2000.

8.

Use the phillips-head screwdriver to tighten all six screws that will hold the expansion module
in place in the XP-2000’s chassis.

Note:

There are two additional screws that are required with the EMI extended face plate as
shown below:

Figure 15. Installing a 1000BASE-SX or 1000BASE-LX gigabit expansion module

9.

Replace the XP-2000’s cover.

When you are ready to attach the segment cables, use the procedures in Attaching Port Cables

on

page 34

.

Attaching the Console Management Cables

The XP-2000 has two ports for attaching management consoles to the XP-2000.

A male DB-9 DCE port for direct serial connection from a terminal. Use this port to perform
basic setup, including setting up the XP-2000 for management through the network using the
CLI or SNMP.

2

1

8

7

6

5

4

3

2

1

8

7

6

5

4

3

2

1

1000BASE-SX

8

7

6

5

4

3

2

1

10/100BASE-TX

1

3

2

4

CONSOLE

10/100 MGMT

OK

ERR

DIAG

HBT

G2M-HTXA2-08

G2M-GSXA1-02

10/100BASE-TX

10/100BASE-TX

Tx

Rx

AN

Link

Tx

Rx

AN

Link

8

9

7

RST

SYS

*

*

*

These two screws are
used only with extended
EMI face plate

Enterasys Networks

Advertising